The Much Anticipated, Alaska Regional Integrated Resource Plan 

"Public comments are welcomed on the RIRP Draft Report.  Please send those comments electronically

 to May Clark at mclark@aidea.org by Wednesday, January 6, 2010.  The comments will be sent to Black & Veatch for consideration."  Jim Strandberg, Project Manager (NGP Photo)

 
 

Alaska RIRP Draft Report – December 4, 2009

 

 
This outline provides a description of what is included in each part of the draft report and a link to each part.   (Word version of this outline) 

If you have difficulty opening the individual reports on this page, please go to our ftp site at  ftp.aidea.orgIf clicking on this link does not redirect you, paste  ftp.aidea.org  in the address bar from your Microsoft My Documents Window. If a sign-on screen comes up, just hit the enter key, no password is required.  The reports are located in the folder:  Alaska_RIRP_Final_Report_120409.

  • Alaska RIRP Draft Report – Part 1 of 6   (1.6 MB)
    • Cover
    • Disclaimer/Acknowledgements
    • Table of Contents
    • List of Tables
    • List of Figures
    • Section 1 – Executive Summary
       
  • Alaska RIRP Draft Report – Part 2 of 6   (628 kb)
    • Section 2 – Project Overview and Approach
    • Section 3 – Situational Assessment
    • Section 4 – Description of Existing System
    • Section 5 – Economic Parameters
    • Section 6 – Forecast of Electrical Demand and Consumption
    • Section 7 – Fuel and Emissions Allowance Price Projections
    • Section 8 – Reliability Criteria
    • Section 9 – Capacity Requirements
       
  • Alaska RIRP Draft Report – Part 3 of 6   (1.03 MB)
    • Section 10 – Supply-Side Options
    • Section 11 – DSM/EE Resources
       
  • Alaska RIRP Draft Report – Part 4 of 6   (1.19 MB)
    • Section 12 – Transmission Projects
       
  • Alaska RIRP Draft Report – Part 5 of 6   (1.12 MB)
    • Section 13 – Summary of Results
    • Section 14 – Implementation Risks and Uncertainties
    • Section 15 – Conclusions and Recommendations
    • Section 16 – Near-Term Implementation Action Plan (2010-2012)
       
  • Alaska RIRP Draft Report – Part 6 of 6   (1.43 MB)
    • Appendix A – Susitna Analysis (HDR, Inc.)
    • Appendix B – Transmission Stability Analysis (to be included in Final Report)
    • Appendix C – Financial Analysis (Seattle-Northwest Securities Corporation)
    • Appendix D – Existing Generation Units
    • Appendix E – Regional Load Forecast
    • Appendix F – Detailed Results – Scenario 1A
    • Appendix G – Detailed Results – Scenario 1B
    • Appendix H – Detailed Results – Scenario 2A
    • Appendix  I  – Detailed Results – Scenario 2B
Presentation of Preliminary Results – Regional Integrated Resource Plan (RIRP) for the Alaska Railbelt, December 10, 2009 Meeting

PowerPoint Presentation

Audio Recordings

#1 Introductions
     Jim Strandberg, AEA (wav) (MP3)

#2 Situational Assessment, Methodology Considerations, Key Assumptions
      Kevin Harper & Myron Rollins – Black & Veatch (wav) (MP3)
#3 Susitna Analysis
      Bob Butera , HDR (wav) (MP3)
#4 Financing the Future
      Dick Schober & Jeb Spengler, Seattle-Northwest Securities(wav) (MP3)
#5 Questions and Answers (wav) (MP3)

 

Formation of the Greater Railbelt Energy and Transmission Corporation (GRETC)
A utility-based approach to GRETC (produced by Chugach Electric Assn., City of Seward and Matanuska Electric Assn.) (Nov 2009)
 
Advisory Work Group Meetings, Coordination Conference Calls
Technical Conference July 7 & 8, 2009
To view DVD (MPEG4) presentations, you may need to download QuickTime.http://www.apple.com/quicktime

RIRP TECHNICAL CONFERENCE Day One – July 7, 2009

Keynote Speaker
Joe Balash, Special Assistant to Governor, Energy, State of Alaska    DVD
Project Overview: Objectives and Scope; Work Plan; Schedule; Issues Facing the Railbelt – Kevin Harper, Black & Veatch    DVD
Alaska’s Railbelt Generation and Transmission System, a Primer
Mark Fouts, Chugach Electric Association    DVD
Potential Role of Renewables
Chris Rose, Renewable Energy Alaska Project-REAP    DVD
Lunch time speaker
Pat Galvin, Commissioner, State of Alaska, Department of Revenue  DVD
Financing the Future Panel – Jeb Spengler, Seattle Northwest Securities; Paul Bloom, Goldman Sachs; Ken Vassar, Birch Horton Bittner & Cherot    DVD
Fuel Portfolio, Coal
Steve Denton, Usibelli Coal Mine   DVD
RIRP TECHNICAL CONFERENCE Day Two – July 8, 2009
Railbelt Hydro Potential
Eric Yould, Wood Canyon Group, Inc.    DVD1  DVD2
Railbelt Geothermal Potential
Paul Thompson, Ormat Technologies, Inc.    DVD (not availagble at this time)
Railbelt DSM
Mark Foster, MAFA    DVD
Natural Gas Panel – Facilitator Jim Gooding, Black & Veatch; Kevin Banks, State of Alaska, Department of Natural Resources; Harold Heinze, Alaska Natural Gas Development Authority; Carri Lockhart, Marathon Oil Co.; Colleen Starring, Enstar Natural Gas Co.; John Zager, Chevron; Dan Clark, Conoco Phillips    DVD
Lunch time speaker
Kevin Banks, State of Alaska, Department of Natural Resource    DVD
Why We Should Plan and Build Together
Group Discussion    DVD
Resource Documents
Mar 1983 Power Project Development and Financing in Alaska
Dec 1982 Selection of Electric Energy Generation Alternative for Consideration in Railbelt Electric Energy Plans Volume II
Mar 1978 Alaskan Electric Power, An Analysis of Future Requirements and Supply for the Railbelt Region
Black & Veatch Consultant
Contact
Jim Strandberg, P.E., Project Manager
Tel. (907) 771-3069
Fax (907) 771-3044 
E-mail: jstrandberg@aidea.org